MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://ntc.gyglfs.com
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.

Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Sarah Discaya grilled by Senate over alleged DPWH links
- Marcos declares holidays for 2026
- PH to see ‘blood moon’ Sept. 7-8
- CBCP president urges Israel to stop military operations in Gaza
- Drones take on Everest's garbage
- President Marcos launches HD Hyundai Shipyard in Subic
- Malaysia warns TikTok vs cyberbullying, deepfakes
- PH, Australia hold live fire drills during ALON 2025 in Nueva Ecija
- Undersea cables cut in the Red Sea, disrupting internet access in Asia and the Mideast
- Manila marks National Heroes Day with job fair